CESC LIMITED, KOLKATA. W.B.

  • Rla of all Boiler No. 1 & 4 at Titagarh Generating Station (TGS)
  • Metallurgical condition assessment of Super Heater Tubes of Boiler No. 2 & 3 at TGS.
  • Rla of Turbine Components of Unit 2. at Kasba Gas Turbine Generating Station.
  • RLA of High Temperature Bolts of Turbine at New Cossipore Generating Station (NCGS).
  • Metallurgical Condition Assessment of Coal Mill Shaft at TGS.
  • Reusability study of Boiler Drum of Unit. 18 after 54 Nos. Ligament crack at Mulajore Generating Station (MGS).
  • Metallurgical condition assessment of different components of H.P. Turbine of Unit 4. At TGS.
  • Reusability study  of Turbine Blades of T/A 1 & 2 at NCGS after localised blade failure.
  • Fluorescent Dye Penetration Testing of Turbine Blades to detect crack at root and lacing wire hole.